“Where do we get our Life and Cost Information?” By Robert M. Nordlund, P.E., R.S. The foundation for any Reserve Study is the association’s projected array of expenses. This array is comprised of assumptions and estimates for life cycle (Useful Life, or UL), when the next expense will occur (Remaining Useful Life, or RUL), and size of that expense (expressed as a current cost). Because this information is critical, at Association Reserves our entire Production Staff meets to discuss recent experiences and trends at monthly meetings called “pricing” meetings. With our client volume, we are continually updating and adjusting the life and cost estimating factors in our “Pricing Notebook” on a monthly basis. In addition, we have a monthly series of guest experts (elevators, roofing, plumbing, asphalt, painting, etc.) who come to our office to provide ongoing training. We believe that the best life and cost estimates are based on the experience of actual properties, not “industry standard” estimating guides. Therefore, our UL estimates are set by each Project Manager based on our experience with the component, adjusted by assumptions or observations regarding quality of material and workmanship, rate of wear and tear, expected normal maintenance, and weather exposure. RUL is established primarily by the component’s current observed condition. The “effective age” of the component may or may not equal the actual “chronological age” of the component due to accelerated wear or low usage. For components requiring a particular expertise or components where age characteristics are not visible (elevators, chillers, security electronics, etc.), it is typical that we interview the association’s service vendor to obtain a recommendation for UL and RUL. Similarly, we believe the best way to obtain an accurate repair or replacement cost for a component is for it to have been historically repaired or replaced, providing us with a valuable benchmark from which to make current cost projections. Note that when an association’s “actual” costs are out of range of our normal expectations due to unusual circumstances unlikely to be repeated, it is unlikely that we will base future estimates on that cost. In absence of recent “actual” costs at an association, we make comparisons to projects that were done recently at similar client associations. For components that require a particular expertise (major roof or roadway systems, elevators, etc.) that are relatively unique to an association, it is our normal practice to interview the association’s vendors to establish suitable cost factors. In summary, our life and cost estimates are based primarily on our observations at the property by a trained Association Reserves Project Manager, adjusted or influenced by our experience with similar properties, and supplemented with vendor interviews. In the rare case where none of this information is available, we look to reliable industry life and cost guidebooks. |
. | ||||||||||
|
. | |||||||||||
Web Design by Global Studio, an advertising agency, send technical questions to info@globalstudio.com |
||||||||||||