Maintenance Schedule
Provided as a sample in June 2025 by Jim Norman, Manager, Park Lane Towers in Denver, CO. See more about this two-tower, 179-residential + 7-commercial units 12-story high-rise built in 1970 at ParkLaneTowers.org.
Original copy and PDF version
January
- Both Buildings: Private 3rd party elevator inspections
- Send elevator inspection reports to the state
- Schedule Total Fire Protection for annual fire equipment inspections + other inspections
February
- Both Buildings: Preventative maintenance on central HVAC systems
- Both Buildings: TK Elevator inspections and repair any private inspection findings
March
- Preventative maintenance on the tractor
- Both Buildings: Clean out dryer vent lines and exterior blower
- South Building: Power wash trash room and chute
April
- North Building: Schedule Murphy Company to have chillers ready to go at May 1st and to clean the garage heat exchanger tubes
- Turn on all 4 irrigation sprinkler systems (weather dependent), fertilize grass, and aerate grass
May
- Both Buildings: Common area carpeting cleaned
- North Building: Power wash Arcade floor coating
- South Building: Outdoor pool drained, cleaned, and refilled
- Both Buildings: Preventative maintenance on central HVAC systems
- South Building: Convert from heating to cooling as temperatures change
- Wash pickleball court coating
June
- Preventative maintenance on the tractor
- Wash pickleball court coating
- Both Buildings: Clean out dryer vent lines and exterior blower
- South Building: Power wash trash room and chute
July
- Wash pickleball court coating
August
- Both Buildings: Preventative maintenance on central HVAC systems
- Wash pickleball court coating
September
- South Building: Outdoor pool closed and winterized
- Both Buildings: HVAC filters in residential and commercial units changed
- Both Buildings: Emergency keys tested
- Preventative maintenance on the tractor
- Wash pickleball court coating
- Both Buildings: Clean out dryer vent lines and exterior blower
- South Building: Power wash trash room and chute
October
- South Building: Convert from cooling to heating as temperatures change
- South Building: Breezeway heating units turned on and tested
- North Building: Power wash Arcade floor coating
- Both Buildings: All carpeting except residential halls cleaned
- Wash pickleball court coating
- Turn off and blowout all 4 irrigation sprinkler systems (weather dependent)
November
- Both Buildings: Preventative maintenance on central HVAC systems
December
- Both Buildings: Clean out dryer vent lines and exterior blower
- Preventative maintenance on the tractor
- South Building: Power wash trash room and chute
Daily Tasks
- Daily opening and checks – follow checklist
- North Building: Swap dumpster in basement with outside spare with tractor
- Pools and hot tub chemicals tested
Weekly Tasks
- Both Buildings: Leaves cleaned up in Fall until all trees are bare
- North Building: Hot tub cleaned every Tuesday morning (water drained and refilled)
- Walk buildings and property for maintenance items, safety issues, and violations
- Reset VoIP phone lines
- Reset cameras and NVRs
- Pick up any trash on grounds
Monthly Tasks
- Both Buildings: Emergency lights and fire extinguishers tested
- Both Buildings: Elevator door tracks vacuumed
- Maintenance Committee meeting on 3rd Thursday of the month
- Check housekeeping paper supplies and order as necessary
- Both Buildings: Walk roofs (weather permitting) looking for any issues
- Clean up shop, boiler rooms, and electric rooms and put tools away