Maintenance Schedule

Provided as a sample in June 2025 by Jim Norman, Manager, Park Lane Towers in Denver, CO. See more about this two-tower, 179-residential + 7-commercial units 12-story high-rise built in 1970 at ParkLaneTowers.org.
Original copy and PDF version

January

  • Both Buildings: Private 3rd party elevator inspections
  • Send elevator inspection reports to the state
  • Schedule Total Fire Protection for annual fire equipment inspections + other inspections

February

  • Both Buildings: Preventative maintenance on central HVAC systems
  • Both Buildings: TK Elevator inspections and repair any private inspection findings

March

  • Preventative maintenance on the tractor
  • Both Buildings: Clean out dryer vent lines and exterior blower
  • South Building: Power wash trash room and chute

April

  • North Building: Schedule Murphy Company to have chillers ready to go at May 1st and to clean the garage heat exchanger tubes
  • Turn on all 4 irrigation sprinkler systems (weather dependent), fertilize grass, and aerate grass

May

  • Both Buildings: Common area carpeting cleaned
  • North Building: Power wash Arcade floor coating
  • South Building: Outdoor pool drained, cleaned, and refilled
  • Both Buildings: Preventative maintenance on central HVAC systems
  • South Building: Convert from heating to cooling as temperatures change
  • Wash pickleball court coating

June

  • Preventative maintenance on the tractor
  • Wash pickleball court coating
  • Both Buildings: Clean out dryer vent lines and exterior blower
  • South Building: Power wash trash room and chute

July

  • Wash pickleball court coating

August

  • Both Buildings: Preventative maintenance on central HVAC systems
  • Wash pickleball court coating

September

  • South Building: Outdoor pool closed and winterized
  • Both Buildings: HVAC filters in residential and commercial units changed
  • Both Buildings: Emergency keys tested
  • Preventative maintenance on the tractor
  • Wash pickleball court coating
  • Both Buildings: Clean out dryer vent lines and exterior blower
  • South Building: Power wash trash room and chute

October

  • South Building: Convert from cooling to heating as temperatures change
  • South Building: Breezeway heating units turned on and tested
  • North Building: Power wash Arcade floor coating
  • Both Buildings: All carpeting except residential halls cleaned
  • Wash pickleball court coating
  • Turn off and blowout all 4 irrigation sprinkler systems (weather dependent)

November

  • Both Buildings: Preventative maintenance on central HVAC systems

December

  • Both Buildings: Clean out dryer vent lines and exterior blower
  • Preventative maintenance on the tractor
  • South Building: Power wash trash room and chute

Daily Tasks

  • Daily opening and checks – follow checklist
  • North Building: Swap dumpster in basement with outside spare with tractor
  • Pools and hot tub chemicals tested

Weekly Tasks

  • Both Buildings: Leaves cleaned up in Fall until all trees are bare
  • North Building: Hot tub cleaned every Tuesday morning (water drained and refilled)
  • Walk buildings and property for maintenance items, safety issues, and violations
  • Reset VoIP phone lines
  • Reset cameras and NVRs
  • Pick up any trash on grounds

Monthly Tasks

  • Both Buildings: Emergency lights and fire extinguishers tested
  • Both Buildings: Elevator door tracks vacuumed
  • Maintenance Committee meeting on 3rd Thursday of the month
  • Check housekeeping paper supplies and order as necessary
  • Both Buildings: Walk roofs (weather permitting) looking for any issues
  • Clean up shop, boiler rooms, and electric rooms and put tools away